This project involved the design and installation of a complete NFPA 13 fire sprinkler system for a 25,000 square foot office building in downtown Los Angeles. The client required a system that would integrate seamlessly with their modern open ceiling design while providing comprehensive fire protection throughout the space.

Our team worked closely with the building's architects and engineers to create a solution that met all code requirements while maintaining the aesthetic vision for the space. The installation included strategic placement of sprinkler heads, careful routing of piping, and integration with the building's other systems.

Square Footage

25,000 sq ft

System Type

NFPA 13

Sprinkler Heads

3884 Units

Timeline

8 Weeks

Project Scope

  • Complete design and hydraulic calculations for a 25,000 sq ft office building
  • Installation of main risers, cross-mains, branch lines, and sprinkler heads
  • Integration with building fire alarm system
  • Installation of fire department connection and control valves
  • Testing and certification of the complete system
  • Coordination with LA Fire Department for inspections and approvals

Technical Specifications

System Components

  • Reliable Model F1FR Series Quick Response Sprinklers
  • Schedule 40 black steel pipe for mains
  • Schedule 10 pipe for branch lines
  • Victaulic grooved fittings
  • 6" fire department connection

Design Parameters

  • Light Hazard Occupancy (Office Areas)
  • Ordinary Hazard Group 1 (Storage Areas)
  • Design density: 0.10 gpm/sq ft (office areas)
  • Design area: 1,500 sq ft
  • Maximum sprinkler spacing: 225 sq ft

Challenges & Solutions

Open Ceiling Design Integration

Challenge: The client wanted to maintain an exposed ceiling design while minimizing the visual impact of the sprinkler system.

Solution: We utilized strategic pipe routing that aligned with structural elements and carefully selected black pipe with clean welds that complemented the industrial aesthetic. Sprinkler heads were positioned to provide required coverage while maintaining visual harmony.

Coordination with Other Building Systems

Challenge: The open ceiling design meant all mechanical, electrical, and plumbing systems would be visible and needed to be coordinated.

Solution: We implemented BIM (Building Information Modeling) to coordinate with other trades, identifying and resolving potential conflicts before installation began. This proactive approach prevented costly rework and delays.

Water Supply Limitations

Challenge: Initial water flow tests indicated marginal water supply for the required sprinkler density.

Solution: We performed detailed hydraulic calculations and strategically sized piping to optimize flow characteristics. This approach eliminated the need for a fire pump, saving the client significant costs while maintaining full code compliance.

Installation Process

1

Pre-Installation Planning

Detailed coordination with all trades to ensure proper integration of systems. Creation of shop drawings and securing necessary permits.

2

Main Riser Installation

Installation of the main riser, fire department connection, and control valves. Pressure testing of the main riser assembly.

3

Main Distribution Piping

Installation of cross-main piping throughout the facility, ensuring proper slope and alignment with structural elements.

4

Branch Line Installation

Installation of branch lines and sprinkler heads according to the approved design. Careful attention to spacing and coverage requirements.

5

Hydrostatic Testing

Comprehensive testing of the entire system at 200 psi for 2 hours to verify integrity of all connections and components.

6

Final Inspection and Certification

Coordination with LA Fire Department for final inspection. System certification and documentation provided to client.

5.0

"Premium Fire's work on our office complex was exceptional. Their team navigated the challenges of our open ceiling design with expertise, creating a system that meets all safety requirements while complementing our modern aesthetic. The project was completed on schedule and their coordination with the fire department made the inspection process seamless."

Robert Thompson

Robert Thompson

Facilities Director, Apex Properties

Project Details

Building Type

Commercial Office

Location

700 San Gabriel Blvd San Gabriel, CA, 91776

Completion Date

April 12, 2025

Project Team

5 Technicians, 1 Project Manager

Certifications

NFPA 13 Compliant, LA Fire Department Approved

Need a Similar Solution?

Our team can design and install a custom fire sprinkler system for your commercial property that meets all code requirements.

Project Timeline

Project Kickoff

February 1, 2025

Initial consultation and site assessment. Detailed discussions of client requirements and project scope.

Project Kickoff Meeting

Initial planning meeting with client team

Design Phase

Engineering team developing system design

Design Phase

February 10-24, 2025

Development of detailed system design, hydraulic calculations, and coordination with other building systems.

Permitting

February 25 - March 10, 2025

Submission of plans to LA Fire Department. Coordination with officials to secure necessary approvals.

Permitting Process

Meeting with fire department officials

Installation Phase

Installation team working on main risers

Installation Phase

March 11 - April 5, 2025

Installation of main risers, cross-mains, branch lines, and sprinkler heads throughout the facility.

Testing & Inspection

April 6-10, 2025

Hydrostatic testing of the system. Final inspection by LA Fire Department officials.

Testing and Inspection

Final inspection with fire department officials

Project Completion

Final walkthrough with client team

Project Completion

April 12, 2025

Final walkthrough with client. Delivery of system documentation and maintenance guidelines.

Similar Projects

Explore other commercial fire sprinkler installations we've completed

Retail Project
Commercial

Alhambra Retail Center

NFPA 13 system for a 15,000 sq ft retail space with specialized coverage for merchandise areas.

Completed January 2025 View Details
Medical Office Project
Commercial

Pasadena Medical Plaza

NFPA 13 system for a 30,000 sq ft medical office building with specialized healthcare considerations.

Completed March 2025 View Details
Tech Office Project
Commercial

Santa Monica Tech Hub

NFPA 13 system for a 20,000 sq ft tech company headquarters with open concept design.

Completed February 2025 View Details

Ready to Discuss Your Fire Protection Needs?

Our team of experts is ready to design and install a custom fire sprinkler system for your commercial property.

Get a Quick Quote

Fill out this form for a no-obligation estimate for your fire sprinkler project.

Why Choose Premium Fire?

Licensed Professionals

CA License #584319

30+ Years Experience

Serving Southern California since 1996

Code Compliant

All systems meet NFPA standards

Need Immediate Assistance?

626-704-1823

Monday-Friday: 8am-6pm

premiumfirewills@gmail.com

We respond within 24 hours